Loading... Please wait...The oil finish can be cleaned with liquids once fully cured. Cleaning should only be done with the recommended Monocoat products.
Respect the curing period as note:
| Oil Plus & 2C Part A | 21 days |
|---|---|
| Oil Plus 2C A & B | 6 days |
| UV Oil | upon installation |
Prior to curing the finish can be dry mopped or vacuumed.
Once cured use one of the following cleaning products:
Restoration or Rejuvenation is a simple process that can be carried out anytime. Most residences will do a restoration between 3–6 years. Most commercial applications will do a restoration between 1-3 years. The time frame varies greatly based on abrasion and wear.
The two products for this process:
Monocoat Natural Oil finish bonding technology allows local touch up of damaged areas or scratches
For repairing minor scratches, follow the above instructions but skip sanding.